logo

516 Coleman Boulevard Parking Lot Construction

Sector: Automotive • Location: Mount Pleasant, South Carolina, United States of America

Source: Dodge

Project
Closed

The Town of Mount Pleasant has elected to pursue a contract for improvements at 516 Coleman Blvd to construct a parking lot. The work will consist of, but not limited to, construction of concrete sidewalk and curb, underground detention system, installation of (2) two EV Charging Stations, Omni Flow lighting systems consisting of 7 26 poles with the 07 Omni-Flow head (approximately 4 in diameter)

Status
Closed
Sector
Automotive, Electric Vehicles (EVs), Road, Car parking, Commercial, Power Generation (CCGT), Cement, Government
Location
Mount Pleasant, South Carolina, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 516 Coleman Boulevard Parking Lot Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “516 Coleman Boulevard Parking Lot Construction” is an infrastructure initiative in the Automotive sector, located in Mount Pleasant, South Carolina, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Town of Mount Pleasant has elected to pursue a contract for improvements at 516 Coleman Blvd to construct a parking lot. The work will consist of, but not limited to, construction of concrete sidewalk and curb, underground detention system, installation of (2) two EV Charging Stations, Omni Flow lighting systems consisting of 7 26 poles with the 07 Omni-Flow head (approximately 4 in diameter) using 15 LED lights, asphalt paving, grass pavers, tree planting and relocation per ANSI A300 par...

Procurement method

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

Mount Pleasant

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Automotive, Electric Vehicles (EVs), Road, Car parking, Commercial, Power Generation (CCGT), Cement, Government

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project