51st CDBG Line Replacement Fair Oaks Blvd/Shelmar Drive
Sector: Water Supply and Storage • Location: Euless, Texas, United States of America
Source: Dodge USA
The project consists of the replacement of the following wastewater mains: 1. Along Fair Oaks Boulevard from Shelmar Drive to Lone Oak Circle and 2. Along Shelmar Drive from Aransas Drive to Cedar Ridge Terrace. (51st year CDBG project) The City of Euless may be seeking a consultant to provide Design for 51st CDBG Line Replacement Fair Oaks Blvd/Shelmar Drive.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project consists of the replacement of the following wastewater mains: 1. Along Fair Oaks Boulevard from Shelmar Drive to Lone Oak Circle and 2. Along Shelmar Drive from Aransas Drive to Cedar Ridge Terrace. (51st year CDBG project) The City of Euless may be seeking a consultant to provide Design for 51st CDBG Line Replacement Fair Oaks Blvd/Shelmar Drive. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
