logo

52 Avenue Waterline Replacement

Sector: Steel • Location: Redwater, Alberta, Canada

Source: Dodge USA

Project
Bidding

The work involves the replacement of approximately 490 meters of 200 mm dia. watermain along 52 Avenue in two phases over two years. Phase 1 2024 Supply and Installation of approx. 250 m of 200 mm dia. PVC Watermain via vertical trench Remove and replace three hydrants and restore curb and gutter and sidewalk Supply and install three gate valves Five connections to existing steel watermain Abandon

Status
Prospective
Sector
Steel, Road, Water Supply and Storage, Commercial, Car parking, Government, Automotive, Metal, Waste Processing and Treatment
Location
Redwater, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 52 Avenue Waterline Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “52 Avenue Waterline Replacement” is an infrastructure initiative in the Steel sector, located in Redwater, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work involves the replacement of approximately 490 meters of 200 mm dia. watermain along 52 Avenue in two phases over two years. Phase 1 2024 Supply and Installation of approx. 250 m of 200 mm dia. PVC Watermain via vertical trench Remove and replace three hydrants and restore curb and gutter and sidewalk Supply and install three gate valves Five connections to existing steel watermain Abandon existing steel watermain in place Backfill and restore pavement structure Phase 2 2025 Supply an...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Redwater

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Road, Water Supply and Storage, Commercial, Car parking, Government, Automotive, Metal, Waste Processing and Treatment

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project