5.40 MWp Rooftop Solar Power Project at Budhni
Sector: Solar • Location: Budhni, Madhya Pradesh, India
Source: The Textile Magazine
Trident Group has commissioned an additional 5.40 MWp rooftop solar power project at its Budhni manufacturing facility, increasing the total installed solar power capacity at the plant to 57.32 MWp. This project reflects the Group's commitment to renewable energy and environmental stewardship, aiming to reduce carbon emissions and promote sustainable energy solutions.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Budhni, Madhya Pradesh, India
- Updated
- 22 Jul 2026
- Source
- The Textile Magazine
ConstructChat
Ask ConstructChat about 5.40 MWp Rooftop Solar Power Project at Budhni
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Trident Group has commissioned an additional 5.40 MWp rooftop solar power project at its Budhni manufacturing facility, increasing the total installed solar power capacity at the plant to 57.32 MWp. This project reflects the Group's commitment to renewable energy and environmental stewardship, aiming to reduce carbon emissions and promote sustainable energy solutions. |
Original sector | Energy |
Budget |
Location
Country | India |
State | Madhya Pradesh |
City | Budhni |
Source
Source | The Textile Magazine |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-04-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
