logo

54th Avenue Resurfacing

Sector: Cement • Location: California, United States of America

Source: Riverside County

Project
Closed

Limits: Harrison Street to Grapefruit Boulevard Length: Approximately 1.61 miles District: 4 Community: Thermal

The County of Riverside Transportation Department is proposing to resurface approximately 1.61 miles of 54th Avenue from Harrison Street to Grapefruit Boulevard. 54th Avenue is classified as an Urban Arterial Road in the County of Riverside General Plan. 54th Avenue is a two lane road

Project Information FAQ

Project Information

4 Q
The project “54th Avenue Resurfacing” is an infrastructure initiative in the Cement sector, located in California, United States of America. Taiyo aggregates data on it from Riverside County.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Limits: Harrison Street to Grapefruit Boulevard Length: Approximately 1.61 miles District: 4 Community: Thermal The County of Riverside Transportation Department is proposing to resurface approximately 1.61 miles of 54th Avenue from Harrison Street to Grapefruit Boulevard. 54th Avenue is classified as an Urban Arterial Road in the County of Riverside General Plan. 54th Avenue is a two lane road and currently ranges from 24-62 feet wide. The proposed project will include Cold-In-Place recycling (CIR) the roadway width, and overlaying the (CIR) material with Rubberized Hot Mix Asphalt (RHMA). Additional improvements include: · Reconstruction of road section(s) · Construction of some driveways, asphalt concrete dike, curb/gutter, and ADA compliant curb ramps · Placement of safety edge and shoulder backing · Utility adjustments · Detector loops · Striping of roadway, including pavement markers and reflectors · Salvage/removal and installation of new signs No additional right-of-way or temporary construction easements will be required to construct the proposed improvements.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data