logo

550 South Sewer Line Replacement

Sector: Waste Processing and Treatment • Location: Provo, Utah, United States of America

Source: Dodge

Project
Pre-Design

Replacing and extending a shallow sewer line to service the Airport Snow Removal Equipment Building and other future construction on the northeast side of the Airport

Status
Prospective
Sector
Waste Processing and Treatment, Water Supply and Storage, Airport, Commercial, Government
Location
Provo, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 550 South Sewer Line Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “550 South Sewer Line Replacement” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Provo, Utah, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacing and extending a shallow sewer line to service the Airport Snow Removal Equipment Building and other future construction on the northeast side of the Airport

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Provo

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Airport, Commercial, Government

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project