logo

57 MW Wind Power Component

Sector: Solar • Location: Gujarat, India

Source: Equitypandit

Project
Completed

Adani Renewable Energy Forty Eight, a subsidiary of Adani Green Energy, has commissioned a 57.2 MW wind power component as part of its wind-solar hybrid project in Khavda, Gujarat. This commissioning increases Adani Green Energy's total operational renewable energy capacity to 11,666.1 MW.

Status
Closed
Sector
Solar, Power Generation (CCGT), Wind
Location
Gujarat, India
Updated
22 Jul 2026
Source
Equitypandit

ConstructChat

Ask ConstructChat about 57 MW Wind Power Component

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “57 MW Wind Power Component” is an infrastructure initiative in the Solar sector, located in Gujarat, India. Taiyo aggregates data on it from Equitypandit.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Adani Renewable Energy Forty Eight, a subsidiary of Adani Green Energy, has commissioned a 57.2 MW wind power component as part of its wind-solar hybrid project in Khavda, Gujarat. This commissioning increases Adani Green Energy's total operational renewable energy capacity to 11,666.1 MW.

Original sector

Energy

Location

Country

India

State

Gujarat

Source

Source

Equitypandit

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Wind

Article published date

2025-01-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project