logo

570 MWh BESS Deployment at Gadarwara and Khargone Power Plants

Sector: Geothermal • Location: India

Source: Saur Energy

Project
Awarded

Deployment of 570 MWh Battery Energy Storage System (BESS) capacity across the Gadarwara and Khargone thermal power plants, comprising a 320 MW BESS project at Gadarwara Super Thermal Power Station and a 250 MW BESS project at Khargone Super Thermal Power Station.

Status
Closed
Sector
Geothermal, Energy Storage, Power Generation (CCGT), Solar
Location
India
Updated
22 Jul 2026
Source
Saur Energy

ConstructChat

Ask ConstructChat about 570 MWh BESS Deployment at Gadarwara and Khargone Power Plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “570 MWh BESS Deployment at Gadarwara and Khargone Power Plants” is an infrastructure initiative in the Geothermal sector, located in India. Taiyo aggregates data on it from Saur Energy.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Deployment of 570 MWh Battery Energy Storage System (BESS) capacity across the Gadarwara and Khargone thermal power plants, comprising a 320 MW BESS project at Gadarwara Super Thermal Power Station and a 250 MW BESS project at Khargone Super Thermal Power Station.

Original sector

Energy

Location

Country

India

Source

Source

Saur Energy

URL

More Details

Record type

Project

Sector

Geothermal, Energy Storage, Power Generation (CCGT), Solar

Article published date

2026-05-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project