570 MWh BESS Deployment at Gadarwara and Khargone Power Plants
Sector: Geothermal • Location: India
Source: Saur Energy
Deployment of 570 MWh Battery Energy Storage System (BESS) capacity across the Gadarwara and Khargone thermal power plants, comprising a 320 MW BESS project at Gadarwara Super Thermal Power Station and a 250 MW BESS project at Khargone Super Thermal Power Station.
- Status
- Closed
- Sector
- Geothermal, Energy Storage, Power Generation (CCGT), Solar
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Saur Energy
ConstructChat
Ask ConstructChat about 570 MWh BESS Deployment at Gadarwara and Khargone Power Plants
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Deployment of 570 MWh Battery Energy Storage System (BESS) capacity across the Gadarwara and Khargone thermal power plants, comprising a 320 MW BESS project at Gadarwara Super Thermal Power Station and a 250 MW BESS project at Khargone Super Thermal Power Station. |
Original sector | Energy |
Location
Country | India |
Source
Source | Saur Energy |
URL |
More Details
Record type | Project |
Sector | Geothermal, Energy Storage, Power Generation (CCGT), Solar |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
