logo

59 MWp Solar Project in Wardha

Sector: Power Generation (CCGT) • Location: Wardha, Maharashtra, India

Source: Machine Maker

Project
Completed

Juniper Green Energy successfully commissioned the 59 MWp solar component of its 75 MW hybrid power project in Wardha, Maharashtra. The solar plant was completed ahead of schedule on June 6, 2025, 17 months before the planned timeline. This solar installation is part of the larger Juniper Green Power Five Project, which includes 75 MW of solar power and 26.4 MW of wind energy. A Power Purchase Agr

Status
Closed
Sector
Power Generation (CCGT), Solar, Wind, Commercial
Location
Wardha, Maharashtra, India
Updated
22 Jul 2026
Source
Machine Maker

ConstructChat

Ask ConstructChat about 59 MWp Solar Project in Wardha

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “59 MWp Solar Project in Wardha” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Wardha, Maharashtra, India. Taiyo aggregates data on it from Machine Maker.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Juniper Green Energy successfully commissioned the 59 MWp solar component of its 75 MW hybrid power project in Wardha, Maharashtra. The solar plant was completed ahead of schedule on June 6, 2025, 17 months before the planned timeline. This solar installation is part of the larger Juniper Green Power Five Project, which includes 75 MW of solar power and 26.4 MW of wind energy. A Power Purchase Agreement was signed with Maharashtra State Electricity Distribution Company Limited (MSEDCL) on November 18, 2024. The full hybrid project is set for commercial operation on November 17, 2026.

Original sector

Renewable Energy

Location

Country

India

State

Maharashtra

City

Wardha

Source

Source

Machine Maker

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar, Wind, Commercial

Article published date

2025-06-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project