logo
ProjectAwarded

5B Maverick Solar Deployment System Manufacturing Scale-up

Sector: Solar • Location: Adelaide, South Australia, Australia

Source: Australian Manufacturing

Australian solar technology company 5B has been selected as the first recipient of funding from the Australian Government’s $1 billion Solar Sunshot Program to scale up manufacturing of its prefabricated solar deployment system, the 'Maverick'. The system uses prewired, prefabricated panels designed for rapid deployment, reducing time, cost, and labour for building solar farms. The Adelaide-based

Status
Closed
Sector
Solar, Government, Commercial, Stadium, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Warehouse
Location
Adelaide, South Australia, Australia
Updated
22 Jul 2026
Source
Australian Manufacturing

ConstructChat

Ask ConstructChat about 5B Maverick Solar Deployment System Manufacturing Scale-up

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “5B Maverick Solar Deployment System Manufacturing Scale-up” is an infrastructure initiative in the Solar sector, located in Adelaide, South Australia, Australia. Taiyo aggregates data on it from Australian Manufacturing.

Participants

Sponsoring Agency

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Australian solar technology company 5B has been selected as the first recipient of funding from the Australian Government’s $1 billion Solar Sunshot Program to scale up manufacturing of its prefabricated solar deployment system, the 'Maverick'. The system uses prewired, prefabricated panels designed for rapid deployment, reducing time, cost, and labour for building solar farms. The Adelaide-based manufacturing facility is expected to produce at least 200 megawatts of Maverick units over the next three years, supporting utility-scale solar projects nationwide.

Original sector

Energy

Budget

Location

Country

Australia

State

South Australia

City

Adelaide

Source

Source

Australian Manufacturing

URL

More Details

Record type

Project

Sector

Solar, Government, Commercial, Stadium, Manufacturing (Industrial), Power Transmission, Power Generation (CCGT), Warehouse

Article published date

2025-05-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project