logo

5C Data Centers - DFW01

Sector: Road • Location: Fort Worth, Texas, United States of America

Source: Dodge USA

Project
Pre-Design

25-acre DFW01 data center campus is conveniently situated in an industrial park between major fiber routes to the other metro areas in Texas. This multi-story facility, with 240,000 total data hall SF, encompasses eight data halls (PODs) optimized to accommodate average densities of over 400W per square foot. DFW01 is powered by its own substation served by Oncor. The DFW01 data center contributes

Status
Prospective
Sector
Road, Mass Transit, Data Center, Car parking, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Commercial, Cement
Location
Fort Worth, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 5C Data Centers - DFW01

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “5C Data Centers - DFW01” is an infrastructure initiative in the Road sector, located in Fort Worth, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

25-acre DFW01 data center campus is conveniently situated in an industrial park between major fiber routes to the other metro areas in Texas. This multi-story facility, with 240,000 total data hall SF, encompasses eight data halls (PODs) optimized to accommodate average densities of over 400W per square foot. DFW01 is powered by its own substation served by Oncor. The DFW01 data center contributes 48MW of IT capacity in the region with the possibility to expand up to 144MW. N+2C electrical re...

Budget

Location

Country

United States of America (USA)

State

Texas

City

Fort Worth

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Mass Transit, Data Center, Car parking, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Commercial, Cement

Article published date

2024-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project