5C Data Centers - DFW01
Sector: Road • Location: Fort Worth, Texas, United States of America
Source: Dodge USA
25-acre DFW01 data center campus is conveniently situated in an industrial park between major fiber routes to the other metro areas in Texas. This multi-story facility, with 240,000 total data hall SF, encompasses eight data halls (PODs) optimized to accommodate average densities of over 400W per square foot. DFW01 is powered by its own substation served by Oncor. The DFW01 data center contributes
- Status
- Prospective
- Sector
- Road, Mass Transit, Data Center, Car parking, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Commercial, Cement
- Location
- Fort Worth, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 5C Data Centers - DFW01
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 25-acre DFW01 data center campus is conveniently situated in an industrial park between major fiber routes to the other metro areas in Texas. This multi-story facility, with 240,000 total data hall SF, encompasses eight data halls (PODs) optimized to accommodate average densities of over 400W per square foot. DFW01 is powered by its own substation served by Oncor. The DFW01 data center contributes 48MW of IT capacity in the region with the possibility to expand up to 144MW. N+2C electrical re... |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Fort Worth |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Mass Transit, Data Center, Car parking, Power Generation (CCGT), Manufacturing (Industrial), Automotive, Commercial, Cement |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
