logo
ProjectOngoing

5G TRACKS

One of 9 projects Taiyo tracks in Bulgaria, Greece.

Source: EU Funding & Tenders Portal

The 5G TRACKS project consists of deploying new network elements and upgrading the existing radio access network to provide uninterrupted cross-border 5G coverage for connected and automated mobility, high-value commercial services and multi-service/multi-application 5G services between Greece and Bulgaria on the Orient/East-Med and Baltic Sea – Black Sea – Aegean Sea Corridor. Specifically, the C

Status
Under Construction
Sector
Commercial, Power Generation (CCGT)
Location
Bulgaria
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about 5G TRACKS

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “5G TRACKS” is an infrastructure initiative in the Commercial sector, located in Bulgaria, Greece. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 5G TRACKS project consists of deploying new network elements and upgrading the existing radio access network to provide uninterrupted cross-border 5G coverage for connected and automated mobility, high-value commercial services and multi-service/multi-application 5G services between Greece and Bulgaria on the Orient/East-Med and Baltic Sea – Black Sea – Aegean Sea Corridor. Specifically, the Corridor sections are: a) Sofia – Plovdiv – Haskovo – Kapitan Andreevo (BG/TR border) and Kapitan Petko Petko Volvoda (BG/EL border); b) Alexandroupoli – Ormenio (BG/EL border); c) Langadas – Kavala – Komotini – Alexandroupoli; and d) Alexandroupoli – Kipoi (EL/TR border). The 5G network will have a 761-km length and will be based on a new 5G Standalone (SA) network architecture supporting advanced service features. The provision of 5G coverage by the project will use the 700 MHz band across the full length of the Corridor sections, and the 3.6 GHz band in “hotspot” areas with increased traffic demand. The project will deploy 161 sites in total including 138 upgrades for uninterrupted 5G SA coverage on a 761-km transport network in Bulgaria and Greece, with a backhaul upgrade from 1G to 10G at existing sites and 100% of the C-band sites in 10G. The network will have an average inter-radio site distance of 4.7km and will enable an average data rate of 1 Mbps per vehicle and average latency <150msec per vehicle. It will be mainly based on optical fibre network connectivity, with provisions for end-to-end power outage protection and high availability, thus ensuring the necessary service continuity. As a direct result of this new connectivity, the project will install eight 5G-enabled meteorological stations on the Sofia-Haskovo-Kapitan Andreevo corridor sections. Additionally, the project will contribute to the clustering of 5G initiatives with the development of concepts and facilities for the interconnection of the 5G corridor sections with edge computing facilities, federated cloud infrastructures and European operational digital platforms. The project will contribute to guarantee seamless connectivity and consistent security standards throughout the entirety of the network and stimulate its integration with other 5G deployments on the TEN-T Network.

Location

Country

Bulgaria

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Commercial, Power Generation (CCGT)

Article published date

2025-10-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project