5th Avenue Water Tower Replacement
Sector: Water Supply and Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
The project works will include: - Install gravel base; - Install two steel towers combined with overflow system, insulation and access panels; - Install approximately 33.5m of 250mm water main combined with 2 gate valves; - Electrical level indicators, civil and mechanical works and supplies; and, - Site preparation and related works.
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Metal, Government
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about 5th Avenue Water Tower Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project works will include: - Install gravel base; - Install two steel towers combined with overflow system, insulation and access panels; - Install approximately 33.5m of 250mm water main combined with 2 gate valves; - Electrical level indicators, civil and mechanical works and supplies; and, - Site preparation and related works. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Metal, Government |
Article published date | 2025-07-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
