5th Street Bridge over Six Mile Creek PD&E Study
Sector: Road • Location: Jacksonville, Florida, United States of America
Source: Florida Department of Transportation (FDOT)
The Florida Department of Transportation (FDOT), District Two, currently has a Project Development & Environment (PD&E) study underway to evaluate alternatives for the replacement of the 5th Street Bridge over Six Mile Creek (Bridge No. 724039), located in Duval County, Florida. What is a PD&E Study? A Project Development & Environment (PD&E) study is the formal process that develops and compares
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | upcoming |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Florida Department of Transportation (FDOT), District Two, currently has a Project Development & Environment (PD&E) study underway to evaluate alternatives for the replacement of the 5th Street Bridge over Six Mile Creek (Bridge No. 724039), located in Duval County, Florida. What is a PD&E Study? A Project Development & Environment (PD&E) study is the formal process that develops and compares alternatives to determine a preferred action that meets project needs, while minimizing impacts to the social, natural, and physical environments. About the Project The project is located on 5th Street in the city of Jacksonville over a tributary of Six Mile Creek. The existing bridge constructed in 1974 is a two-lane, four span concrete slab bridge with timber piles, and has been classified a “Structurally Deficient” by the Bridge Inspection Report dated July 2022. As a result, FDOT is conducting a PD&E Study to evaluate alternatives to replace the existing structurally deficient bridge. Without any improvements, the bridge will continue to deteriorate, requiring weight restrictions and possibly closing the bridge to the public. Proposed Bridge The proposed bridge improvements will provide a new single-span bridge constructed with precast concrete slabs on concrete piles containing: Two 11-foot travel lanes 8-foot shoulders 5-foot sidewalk on the northern side of 5th Street Right -of-way width 70 feet |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
