logo

5th Street Complete Street Project

Sector: Automotive • Location: Georgia, United States of America

Source: Federal Highway Administration (FHWA)

Project
Closed

In Atlanta, 5th Street is a key east-west corridor that connects Georgia Tech, the Midtown Improvement District, and the Midtown Garden District, and is one of the most popular multimodal streets in the city. Presently, 5th Street sees up to 15,000 pedestrians, 1,000 cyclists, and 8,000 vehicles daily. Current and anticipated future development along the corridor is expected to increase activit

Project Information FAQ

Project Information

5 Q
The project “5th Street Complete Street Project” is an infrastructure initiative in the Automotive sector, located in Georgia, United States of America. Taiyo aggregates data on it from Federal Highway Administration (FHWA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In Atlanta, 5th Street is a key east-west corridor that connects Georgia Tech, the Midtown Improvement District, and the Midtown Garden District, and is one of the most popular multimodal streets in the city. Presently, 5th Street sees up to 15,000 pedestrians, 1,000 cyclists, and 8,000 vehicles daily. Current and anticipated future development along the corridor is expected to increase activity, requiring vehicular, pedestrian, and bicycle improvements to keep up. The 5th Street corridor plan (0.6 mi from Myrtle Street west to the downtown connector at Williams Street) includes pedestrian amenities and improvements such as replacing damaged sidewalks and curbing, additional and upgraded Americans with Disabilities Act (ADA) ramps and crosswalks at all intersections, complete pedestrian lighting for safety, and infill street trees and furniture. Two of the primary design goals of the project is to avoid moving curb lines and impacting private right-of-way in order to keep costs down and avoid extending the project delivery timeline. The width of the public right-of-way within Tech Square allows for the inclusion of bollards and on-street parking to provide a barrier from the vehicular travel lanes. The width of the public right-of-way east of Tech Square, however, does not allow for the inclusion of bollards or similar barriers. The project design includes a two-way cycle track designed to meet accepted design standards and allow safe passage of cyclists/scooter riders. The cycle track will be separated from the vehicular travel lanes by bollards and on-street parked cars. In addition, there is a dedicated bike crossing phase, followed by a leading pedestrian interval and a traditional vehicular phase to facilitate safe crossings for pedestrians, cyclists, and scooter riders. The design also includes upgraded existing bike lanes and signage, milling and repaving damaged portions of the roadway to improve the experience for both drivers and cyclists, and restriping the bike lane in those sections of the roadway. The changes will not eliminate Tech Trolley operations in Tech Square. The proposed design offers a raised mixing zone, which considers all modes and includes signage, tactile warning strips, and surface material change to alert users to the mixing zone area. The Midtown Alliance’s design team Tunnell-Spangler-Walsh & Associates (TSW), and in partnership with the City of Atlanta’s Transportation Special Purpose Local Option Sales Tax (TSPLOST) TSPLOST Program, began the design and engineering phase in 2018. Work proceeded through 2019 and 2020 to complete an existing conditions survey and analysis, coordinate with the city and stakeholders, and create a conceptual and schematic design. They also developed construction documents and secured city approvals and permitting.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data