logo
ProjectBid Results

60-0 Single Span Concrete Bridge Construction

Bid results · Tennessee · Last reported Dec 2024

Source: Dodge USA

construction of a 60 -0 single span concrete bridge (70-degree skew) on Swamp Road over Harpeth River (Concord Creek).

Status
Closed
Sector
Commercial, Government, Bridge, Cement, Road
Location
Eagleville, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 60-0 Single Span Concrete Bridge Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “60-0 Single Span Concrete Bridge Construction” is an infrastructure initiative in the Commercial sector, located in Eagleville, Tennessee, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bid results

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

construction of a 60 -0 single span concrete bridge (70-degree skew) on Swamp Road over Harpeth River (Concord Creek).

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Eagleville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Government, Bridge, Cement, Road

Article published date

2024-12-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project