60 Forge Village Road New Pfas Water Treatment Plant
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge USA
The Town of Westford Zoning Bylaw for the installation of a PFAS water treatment plant and associated pavement, grading, and utilities and a Stormwater Management Permit in accordance with Chapter 147 of the Town of Westford General Bylaws for a project disturbing over 1 acre and any other permit or relief as may be required under the Town of Westford Zoning Bylaw or General Bylaws. The subject pr
- Status
- Prospective
- Sector
- Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government, Power Generation (CCGT)
- Location
- Westford, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 60 Forge Village Road New Pfas Water Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Town of Westford Zoning Bylaw for the installation of a PFAS water treatment plant and associated pavement, grading, and utilities and a Stormwater Management Permit in accordance with Chapter 147 of the Town of Westford General Bylaws for a project disturbing over 1 acre and any other permit or relief as may be required under the Town of Westford Zoning Bylaw or General Bylaws. The subject property is located at 60 Forge Village Road in the Residence A RA Zoning District and is identifie... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Westford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government, Power Generation (CCGT) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
