60 MW Baseload
Sector: Road • Location: Mauritania
Source: IFC Project Disclosures
The proposed investment supports the construction and operation of a hybrid renewable energy facility in the Moughataa of Toujounine, Wilaya of Nouakchott-Nord, Mauritania. The facility comprises a 160 MWp solar photovoltaic (PV) plant and a 180 MW / 370 MWh battery energy storage system (BESS) (the “Project” or “Phase 1”). The PV plant will use approximately 266,000 bifacial modules mounted on si
- Status
- Prospective
- Sector
- Road, Energy Storage, Oil and Gas, Fertilizers, Wind, Solar, Power Generation (CCGT), Metal
- Location
- Mauritania
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about 60 MW Baseload
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed investment supports the construction and operation of a hybrid renewable energy facility in the Moughataa of Toujounine, Wilaya of Nouakchott-Nord, Mauritania. The facility comprises a 160 MWp solar photovoltaic (PV) plant and a 180 MW / 370 MWh battery energy storage system (BESS) (the “Project” or “Phase 1”). The PV plant will use approximately 266,000 bifacial modules mounted on single-axis trackers and connected to string inverters and 33 kV transformer stations. The BESS will consist of 26 arrays of containerized, liquid-cooled lithium iron phosphate (LFP) batteries with an integrated battery management system. The Project is sponsored by Istithmar West Africa (IWA or the “Sponsor”), a Mauritanian independent power producer active across West Africa and a new IFC client. It will be developed and operated by a dedicated special purpose vehicle (SPV) under a 15-year public-private partnership (PPP) contract with the Ministry of Energy and Petroleum. In addition to the PV plant and BESS, the 1,000 ha site will include a 33/225 kV substation, a 350 m, 225 kV overhead transmission line (OHTL) connecting to the SOMELEC grid, a new access road of approximately 2 km from the Rocade ring road, and a SCADA control system. Equipment will be imported through the Port of Nouakchott and transported via the RN2 and the Rocade. Construction is expected to take about 12 months.The site will also host a 60 MW wind development (“Phase 2”), comprising 12 wind turbines of 5 MW each, connected to the Project substation. Phase 2 will be built over about 18 months after the completion of Phase 1 and is not part of the proposed IFC investment. As a planned development on the same site that will use Project infrastructure, its impacts are considered cumulative impacts within the Project’s area of influence (see PS1). |
Original sector | V-BF - Solar - Renewable Energy Generation |
Location
Country | Mauritania |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Road, Energy Storage, Oil and Gas, Fertilizers, Wind, Solar, Power Generation (CCGT), Metal |
Article published date | 2026-10-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project