logo
ProjectPlanned

60 MW Solar Power Project

Sector: Power Generation (CCGT) • Location: Maharashtra, India

Source: Saur Energy International

Hariom Pipe Industries Limited has secured a Letter of Award to develop a 60 MW (AC) Solar Photovoltaic Power Generating Station under the PM-KUSUM Scheme. The project aims to implement feeder-level solarization and is expected to be completed within 18 months.

Status
Prospective
Sector
Power Generation (CCGT), Solar
Location
Maharashtra, India
Updated
22 Jul 2026
Source
Saur Energy International

ConstructChat

Ask ConstructChat about 60 MW Solar Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “60 MW Solar Power Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Maharashtra, India. Taiyo aggregates data on it from Saur Energy International.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Hariom Pipe Industries Limited has secured a Letter of Award to develop a 60 MW (AC) Solar Photovoltaic Power Generating Station under the PM-KUSUM Scheme. The project aims to implement feeder-level solarization and is expected to be completed within 18 months.

Original sector

Energy

Location

Country

India

State

Maharashtra

Source

Source

Saur Energy International

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2025-03-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project