logo

60 MW Wind-Solar Hybrid Power PPA Withdrawal

The owner, status and timeline of this project. A free account opens every field.

Source: Mercomindia.com

Project
Cancelled

The Maharashtra Electricity Regulatory Commission (MERC) has allowed Mindspace Business Parks, Gigaplex Estate, and KRC Infrastructure and Projects to withdraw their request for approval of a long-term power purchase agreement (PPA) to procure 60 MW of wind-solar hybrid power.

Status
Closed
Sector
Power Generation (CCGT), Wind, Solar
Location
Maharashtra, India
Updated
22 Jul 2026
Source
Mercomindia.com

ConstructChat

Ask ConstructChat about 60 MW Wind-Solar Hybrid Power PPA Withdrawal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “60 MW Wind-Solar Hybrid Power PPA Withdrawal” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Maharashtra, India. Taiyo aggregates data on it from Mercomindia.com.

Participants

Not available for this record.

Status

Original status

cancelled

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Maharashtra Electricity Regulatory Commission (MERC) has allowed Mindspace Business Parks, Gigaplex Estate, and KRC Infrastructure and Projects to withdraw their request for approval of a long-term power purchase agreement (PPA) to procure 60 MW of wind-solar hybrid power.

Original sector

Energy

Location

Country

India

State

Maharashtra

Source

Source

Mercomindia.com

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Wind, Solar

Article published date

2026-04-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project