60-MWh Merchant Battery Energy Storage System (BESS) Project
The owner, status and timeline of this project. A free account opens every field.
Source: News on Projects
Juniper Green Energy commissioned a 60-MWh capacity of its 100-MWh merchant Battery Energy Storage System (BESS) project at Bikaner, Rajasthan through its subsidiary Juniper Green Cosmic. The project has completed trial operations and received approval from the Northern Regional Load Despatch Centre (NRLDC).
- Status
- Closed
- Sector
- Energy Storage
- Location
- Bikaner, Rajasthan, India
- Updated
- 22 Jul 2026
- Source
- News on Projects
ConstructChat
Ask ConstructChat about 60-MWh Merchant Battery Energy Storage System (BESS) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Juniper Green Energy commissioned a 60-MWh capacity of its 100-MWh merchant Battery Energy Storage System (BESS) project at Bikaner, Rajasthan through its subsidiary Juniper Green Cosmic. The project has completed trial operations and received approval from the Northern Regional Load Despatch Centre (NRLDC). |
Original sector | Energy |
Location
Country | India |
State | Rajasthan |
City | Bikaner |
Source
Source | News on Projects |
URL |
More Details
Record type | Project |
Sector | Energy Storage |
Article published date | 2025-12-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
