logo

600 MW SOLAR POWER PROJECT UNDER CPSU SCHEME

Sector: Manufacturing (Industrial) • Location: KHAVDA, Gujarat, India

Source: India Investment Grid (IIG)

Project
Notice To Proceed

Information National Hydroelectric Power Corporation Limited [NHPC] has come up with 600 MW SOLAR POWER PROJECT UNDER CPSU SCHEME with a ticket size of 4100.45 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project 600 MW Solar Power Pro

Project Information FAQ

Project Information

5 Q
The project “600 MW SOLAR POWER PROJECT UNDER CPSU SCHEME” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in KHAVDA, Gujarat, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

notice to proceed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information National Hydroelectric Power Corporation Limited [NHPC] has come up with 600 MW SOLAR POWER PROJECT UNDER CPSU SCHEME with a ticket size of 4100.45 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project 600 MW Solar Power Project is being set up under CPSU Scheme, Phase-II, Tranche-III against the total allocated capacity of 1000 MW to NHPC Limited by IREDA. NHPC is implementing the development of this project through EPC Contract for 600 MW Grid Connected Solar PV Project and transmission line for power evacuation to ISTS sub-station along with comprehensive O&M for 05 years. The power generated from the project shall be evacuated through KPS-III ISTS Substation for use by Government / Government entities through Distribution Companies [DISCOMS]. Only domestically manufactured Cells & Modules shall be used for setting up of Solar Plant as per the provision of CPSU Scheme.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data