600 South Park Development
Sector: Waste Processing and Treatment • Location: Logan, Utah, United States of America
Source: Dodge
The project objectives for 600 South Park are to achieve the following: 1. A parking lot that will accommodate 100 spaces 2. A two-stall per gender restroom 3. Paved walkway from parking lot to hand-carry watercraft ramp 4. Curb, gutter, park strip, sidewalk at frontage of park on 600 South 5. Piped irrigation ditch along 600 South 6. Storm water basin construction 7. Utilities for City water, sew
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Car parking, Automotive, Commercial, Government
- Location
- Logan, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 600 South Park Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project objectives for 600 South Park are to achieve the following: 1. A parking lot that will accommodate 100 spaces 2. A two-stall per gender restroom 3. Paved walkway from parking lot to hand-carry watercraft ramp 4. Curb, gutter, park strip, sidewalk at frontage of park on 600 South 5. Piped irrigation ditch along 600 South 6. Storm water basin construction 7. Utilities for City water, sewer, and power 8. Minimized landscaping and irrigation 9. Looped paved walking path |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | Logan |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Car parking, Automotive, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
