60MW Mmadinare Solar Cluster in Botswana
Sector: Solar • Location: Botswana
Source: PV Tech
Scatec has commissioned the first 60MW of a planned 120MW solar PV cluster in Botswana under a 25-year PPA with the Botswana Power Corporation. The remaining 60MW is expected to be online in early 2026.
- Status
- Under Construction
- Sector
- Solar, Power Generation (CCGT)
- Location
- Botswana
- Updated
- 22 Jul 2026
- Source
- PV Tech
ConstructChat
Ask ConstructChat about 60MW Mmadinare Solar Cluster in Botswana
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scatec has commissioned the first 60MW of a planned 120MW solar PV cluster in Botswana under a 25-year PPA with the Botswana Power Corporation. The remaining 60MW is expected to be online in early 2026. |
Original sector | Energy |
Location
Country | Botswana |
Source
Source | PV Tech |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-03-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in Botswana
- Botswana - The Pandamatenga Agricultural Infrastructure Development Project
- Botswana - The Pandamatenga Agricultural Infrastructure Development Project
- Botswana - The Pandamatenga Agricultural Infrastructure Development Project
- Botswana - Feasibility Study for a 200 Megawatts Concentrating Solar Power Plant
- Botswana - Feasibility Study for a 200 Megawatts Concentrating Solar Power Plant
- Gaborone Smart City Master Plan
- Letlhakane Solar Project
- Solar PV plant PPP project in Bobonong
