logo
ProjectAwarded

62.20 MW Solar Project Order

Sector: Power Generation (CCGT) • Location: Gujarat, India

Source: Energetica India Magazine

Sun Drops Energia has secured a 62.20 MW solar project order under the Captive Power Producer (CPP) segment, increasing KPI Green Energy’s total CPP capacity to 152.34 MW. The projects are expected to be developed in various phases and completed by the financial year 2025-26.

Status
Closed
Sector
Power Generation (CCGT), Solar
Location
Gujarat, India
Updated
22 Jul 2026
Source
Energetica India Magazine

ConstructChat

Ask ConstructChat about 62.20 MW Solar Project Order

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “62.20 MW Solar Project Order” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Gujarat, India. Taiyo aggregates data on it from Energetica India Magazine.

Participants

Not available for this record.

Status

Original status

Awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Sun Drops Energia has secured a 62.20 MW solar project order under the Captive Power Producer (CPP) segment, increasing KPI Green Energy’s total CPP capacity to 152.34 MW. The projects are expected to be developed in various phases and completed by the financial year 2025-26.

Original sector

Energy

Location

Country

India

State

Gujarat

Source

Source

Energetica India Magazine

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2025-01-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project