logo
ProjectClosed

625 Building Office Remodeling Phase 2

Closed · Minnesota · Last reported Mar 2024

Source: Dodge USA

Phase 2 interior office remodel project includes full floor remodels on 6th, 9th, 14th and 15th floors. The floors will be completed in that order for occupancy requirements. The total USF of Phase 2 is 79,797 SF. The first Phase included floors 8, 10, 11, 13 and 16. The Phase 2 work will match all finishes with the Phase 1 work per plans. The scope on each floor includes full interior demolition

Status
Closed
Sector
Commercial, Residential, Government, Manufacturing (Industrial)
Location
Minneapolis, Minnesota, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 625 Building Office Remodeling Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “625 Building Office Remodeling Phase 2” is an infrastructure initiative in the Commercial sector, located in Minneapolis, Minnesota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Phase 2 interior office remodel project includes full floor remodels on 6th, 9th, 14th and 15th floors. The floors will be completed in that order for occupancy requirements. The total USF of Phase 2 is 79,797 SF. The first Phase included floors 8, 10, 11, 13 and 16. The Phase 2 work will match all finishes with the Phase 1 work per plans. The scope on each floor includes full interior demolition except for the building core: bathrooms, elevator lobbies and air shafts. There will be some abat...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Minneapolis

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Residential, Government, Manufacturing (Industrial)

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project