64 MWac Solar Balance of System (BoS) Power Plant
The owner, status and timeline of this project. A free account opens every field.
Source: Machine Maker
Development of a 64 MWac / 96 MWp Solar Balance of System (BoS) power plant at Mahua, Gujarat. The project includes design, procurement, supply, installation, testing, and commissioning of the BoS for the solar power plant to enhance renewable energy capacity.
- Status
- Closed
- Sector
- Solar, Power Generation (CCGT)
- Location
- Mahua, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Machine Maker
ConstructChat
Ask ConstructChat about 64 MWac Solar Balance of System (BoS) Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Development of a 64 MWac / 96 MWp Solar Balance of System (BoS) power plant at Mahua, Gujarat. The project includes design, procurement, supply, installation, testing, and commissioning of the BoS for the solar power plant to enhance renewable energy capacity. |
Original sector | Renewable Energy |
Location
Country | India |
State | Gujarat |
City | Mahua |
Source
Source | Machine Maker |
URL |
More Details
Record type | Project |
Sector | Solar, Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
