650 MW Solar Power Project BOS Supply at Khavda Renewable Energy Park
Sector: Power Generation (CCGT) • Location: Gujarat, India
Source: TaiyangNews
Bondada Engineering has received a letter of intent from Adani Group to supply balance of system (BOS) goods, including design, engineering, and commissioning for a 650 MW solar power project at Khavda Renewable Energy Park, Gujarat, with a contract value of INR 10.5 billion ($119 million).
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | awarded |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Bondada Engineering has received a letter of intent from Adani Group to supply balance of system (BOS) goods, including design, engineering, and commissioning for a 650 MW solar power project at Khavda Renewable Energy Park, Gujarat, with a contract value of INR 10.5 billion ($119 million). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
