logo

66 Quintara Connectivity Study

Sector: Power Transmission • Location: San Francisco, California, United States of America

Source: SFMTA Projects

Project
Close

66 Quintara Connectivity Study Share this: Facebook Twitter LinkedIn Project Introduction The SFMTA is evaluating the 66 Quintara route to identify potential service and connection changes to optimize access to neighborhood destinations and transit hubs. The route currently serves a diverse segment of western San Francisco from the Inner Sunset, over Sunset Heights, and through the Parkside Distri

Project Information FAQ

Project Information

4 Q
The project “66 Quintara Connectivity Study” is an infrastructure initiative in the Power Transmission sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

66 Quintara Connectivity Study Share this: Facebook Twitter LinkedIn Project Introduction The SFMTA is evaluating the 66 Quintara route to identify potential service and connection changes to optimize access to neighborhood destinations and transit hubs. The route currently serves a diverse segment of western San Francisco from the Inner Sunset, over Sunset Heights, and through the Parkside District. Project Timeline Summer/Fall 2017 Community Outreach and Planning Completed Winter 2018 Final Recommendations Completed Spring/Summer 2018 Implementation Completed Project Status Completed Bus Routes and Rail Lines 66 Quintara Neighborhoods Parkside Inner Sunset Outer Sunset PROJECT RESULTS The 66 Quintara Connectivity Study sought to identify alternative routing to better meet the west-side neighborhood’s transit access and connectivity needs while optimizing the use of resources. The study looked at current ridership and productivity patterns on the 66 Quintara, as well as the demographic profile of the surrounding area. In addition to this analysis, community outreach meetings and in-person and online surveys were conducted. Results of the study informed the following improvements: Increase monitoring of terminal departures times. Muni inspectors will be monitoring the terminal to help with operators leaving early. New stop at 8th Ave and Judah. Allows passengers to exit the bus sooner or to make quicker connections instead of having to wait until the terminal to get off. New timepoint for Nextbus. This will improve predictions for both directions. Increased service on the weekends. Frequency increased from 30 mins to 20 mins on evenings after 10pm and on weekends. Other route service improvements heard through the study: Increase service on the 48 Quintara-24th Street route. Mid-day service added between West Portal and Great Highway. In addition to these service improvements, the community profile generated by the study can inform future opportunities to re-imagine west-side connections. PROJECT OBJECTIVE The objective of the 66 Quintara Connectivity Study is to identify alternative routing for the 66 Quintara line to better meet the west-side neighborhoods’ transit access and connectivity needs, while optimizing use of resources. SFMTA will utilize a combination of in-person and online surveys, community meetings, and stakeholder interviews to help determine community preferences. Understanding which services customers currently depend on, and which services are currently lacking, will help inform the future direction of this route. This project is made possible by the San Francisco County Transportation Authority through a grant of Proposition K Local Transportation Sales Tax Funds. 66 Quintara Route

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data