66/11 KV GIS Substation and 66 KV Underground Transmission Line Project in Gurugram
Awarded · Haryana · Last reported Jul 2025
Source: Trade Brains
K2 InfraGen Limited received a work order for the design, manufacturing, supply, erection, testing, and commissioning of a 66/11 KV GIS substation with SAS, along with a 66 KV underground transmission line in Manesar, Gurugram. The project is expected to be completed within 15 months and supports the company's growth in infrastructure projects.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Gurugram, Haryana, India
- Updated
- 22 Jul 2026
- Source
- Trade Brains
ConstructChat
Ask ConstructChat about 66/11 KV GIS Substation and 66 KV Underground Transmission Line Project in Gurugram
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | K2 InfraGen Limited received a work order for the design, manufacturing, supply, erection, testing, and commissioning of a 66/11 KV GIS substation with SAS, along with a 66 KV underground transmission line in Manesar, Gurugram. The project is expected to be completed within 15 months and supports the company's growth in infrastructure projects. |
Original sector | Power Transmission |
Budget |
Location
Country | India |
State | Haryana |
City | Gurugram |
Source
Source | Trade Brains |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
