66KV Double-Circuit Transmission Line Project
Sector: Power Generation (CCGT) • Location: Ahmedabad, Gujarat, India
Source: Trade Brains
HEC Infra Projects Limited has received a work order from Blue Pine Energy Pvt. Ltd for the Engineering, Procurement, and Construction (EPC) of a 66KV double-circuit transmission line along with 12 km of underground cable. The project is to be executed within 3 months and aligns with the company's growth strategy in the power infrastructure sector.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Ahmedabad, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Trade Brains
ConstructChat
Ask ConstructChat about 66KV Double-Circuit Transmission Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | HEC Infra Projects Limited has received a work order from Blue Pine Energy Pvt. Ltd for the Engineering, Procurement, and Construction (EPC) of a 66KV double-circuit transmission line along with 12 km of underground cable. The project is to be executed within 3 months and aligns with the company's growth strategy in the power infrastructure sector. |
Original sector | Power |
Budget |
Location
Country | India |
State | Gujarat |
City | Ahmedabad |
Source
Source | Trade Brains |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-04-19 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
