66KV Double-Circuit Transmission Line Project
Sector: Power Generation (CCGT) • Location: Ahmedabad, Gujarat, India
Source: Trade Brains
HEC Infra Projects Limited has received a work order from Blue Pine Energy Pvt. Ltd for the Engineering, Procurement, and Construction (EPC) of a 66KV double-circuit transmission line, including the installation of 12 km of underground cable. The project is expected to enhance the company's presence in the power infrastructure sector and is to be executed within 3 months.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Ahmedabad, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Trade Brains
ConstructChat
Ask ConstructChat about 66KV Double-Circuit Transmission Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | HEC Infra Projects Limited has received a work order from Blue Pine Energy Pvt. Ltd for the Engineering, Procurement, and Construction (EPC) of a 66KV double-circuit transmission line, including the installation of 12 km of underground cable. The project is expected to enhance the company's presence in the power infrastructure sector and is to be executed within 3 months. |
Original sector | Power |
Budget |
Location
Country | India |
State | Gujarat |
City | Ahmedabad |
Source
Source | Trade Brains |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-04-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
