6786860-CN 6314 7TH AVE S
One of 10,000+ projects Taiyo tracks in Washington.
Source: City of Seattle
Proposed project is convert existing site to parking lots. Scope of works are to demolish existing buildings, concrete foundations, and utility lines and cap off, then resurface with asphaltic concrete pavement.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Transmission, Road, Car parking, Residential, Government, Power Generation (CCGT), Cement, Commercial, Automotive
- Location
- Seattle, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Seattle
ConstructChat
Ask ConstructChat about 6786860-CN 6314 7TH AVE S
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | additional info requested |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Proposed project is convert existing site to parking lots. Scope of works are to demolish existing buildings, concrete foundations, and utility lines and cap off, then resurface with asphaltic concrete pavement. |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | City of Seattle |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Transmission, Road, Car parking, Residential, Government, Power Generation (CCGT), Cement, Commercial, Automotive |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
