logo

68 MW Solar Project by New Age Energy Tri

Sector: Solar • Location: Montenegro

Source: See News

Project
Planned

New Age Energy Tri has received an eco permit from the Environmental Protection Agency of Montenegro for the development of a 68 MW solar photovoltaic plant in Niksic. The project will utilize 113,335 solar panels and is set to be connected to the local power grid.

Status
Prospective
Sector
Solar, Power Generation (CCGT)
Location
Montenegro
Updated
22 Jul 2026
Source
See News

ConstructChat

Ask ConstructChat about 68 MW Solar Project by New Age Energy Tri

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “68 MW Solar Project by New Age Energy Tri” is an infrastructure initiative in the Solar sector, located in Montenegro. Taiyo aggregates data on it from See News.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

New Age Energy Tri has received an eco permit from the Environmental Protection Agency of Montenegro for the development of a 68 MW solar photovoltaic plant in Niksic. The project will utilize 113,335 solar panels and is set to be connected to the local power grid.

Original sector

Energy

Location

Country

Montenegro

Source

Source

See News

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT)

Article published date

2025-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project