logo

69th Street Wastewater Treatment Plant, TX

Sector: Fertilizers • Location: Texas, United States of America

Source: Ferrovial

Project
Active

Ferrovial Business Lines Projects 69th Street Wastewater Treatment Plant, TX Houston, Texas $14M Value PLW Waterworks conducted significant rehabilitation of a City of Houston wastewater plant. The City of Houston manufactures a fertilizer product from the Sludge Processing Facility area of the 69th Street Wastewater Treatment Plant. The manufacturing process involves the sterilization, dewateri

Project Information FAQ

Project Information

5 Q
The project “69th Street Wastewater Treatment Plant, TX” is an infrastructure initiative in the Fertilizers sector, located in Texas, United States of America. Taiyo aggregates data on it from Ferrovial.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Ferrovial Business Lines Projects 69th Street Wastewater Treatment Plant, TX Houston, Texas $14M Value PLW Waterworks conducted significant rehabilitation of a City of Houston wastewater plant. The City of Houston manufactures a fertilizer product from the Sludge Processing Facility area of the 69th Street Wastewater Treatment Plant. The manufacturing process involves the sterilization, dewatering, oven drying, pelletizing and storage of waste sludge into fertilizer.  The bulk of this project included an upgrade to the seven dryer units, allowing for increased capacities, cleaner operations, automated control, and improved conveyance.  Due to the complexities and demands of the facility to continually rid itself of the waste sludge materials, only one dryer bank could shut down operation for the upgrade at a time.  Electrical, instrumentation, process and piping work had to be performed individually in concert with the entire process in action.  Other work included pump replacement, electrical sub-station improvements, bird/pigeon exclusion devices, clarifier upgrades and digester cleaning.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data