logo

6ME PROJET D'ALIMENTAT EN EAU POTABLE

Sector: Residential • Location: Morocco

Source: African Development Bank (AfDB)

Project

The sixth drinking water project is part of the Bank's intervention program for the development of the drinking water supply sector in Morocco and meets the drinking water needs of a population of about 2 million. It includes several sub-projects concerning the cities of Tangier, Marrakech, Casablanca, Sidi Kacem, Ouarzazate, Benguerir, Assa Khémisset and Tiflet, as well as sanitation studies and

Project Information FAQ

Project Information

4 Q
The project “6ME PROJET D'ALIMENTAT EN EAU POTABLE” is an infrastructure initiative in the Residential sector, located in Morocco. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The sixth drinking water project is part of the Bank's intervention program for the development of the drinking water supply sector in Morocco and meets the drinking water needs of a population of about 2 million. It includes several sub-projects concerning the cities of Tangier, Marrakech, Casablanca, Sidi Kacem, Ouarzazate, Benguerir, Assa Khémisset and Tiflet, as well as sanitation studies and actions to improve the control of water quality. The main activities of the project cover: (i) the pipes; (ii) civil engineering; (iii) pumping stations; (iv) power lines; (v) booster stations; (vi) water intakes; (vii) laboratory equipment; (viii) equipment; (ix) technical assistance; (x) training and (xi) supervision of the work. The project is scheduled to be completed over a period of 4 years at a total cost estimated at UA 49.80 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data