logo

7 TIE Structure Replacements

Sector: Metal • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
In Progress

The project consists of the replacement of 7 buried culvert structures (either plastic, concrete, or corrugated metal) at 7 locations across the province. The length of assets receiving investment is approximately 1.5 KM. The project will result in all new structures, asphalt and slope protection. The project scope includes: - installation of environmental controls (silt fences, straw mulch, silt

Project Information FAQ

Project Information

3 Q
The project “7 TIE Structure Replacements” is an infrastructure initiative in the Metal sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the replacement of 7 buried culvert structures (either plastic, concrete, or corrugated metal) at 7 locations across the province. The length of assets receiving investment is approximately 1.5 KM. The project will result in all new structures, asphalt and slope protection. The project scope includes: - installation of environmental controls (silt fences, straw mulch, silt booms, check dams, retention ponds); - clearing and grubbing of vegetation; - excavation of earthen material to gain access to the buried structures for removal; - removal and disposal of the existing buried structures; - provision of temporary stream alignments in order to install new structures; - preparation of base material for new structures; - installation of new buried structures; - supply, placement and compaction of suitable backfill material over the new structures; - supply, placement and compaction of roadway base gravels and asphalt base and wearing surfaces; - supply and placement of topsoil and hydroseed; and - site clean-up. The current structures are in poor condition and in a state of disrepair. The structures need to be replaced in order to maintain a level of public safety on the provincial highway network. The project will benefit the community by providing safer and more reliable road infrastructure.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data