700 North Sewer Rehabilitation
Sector: Water Supply and Storage • Location: North Salt Lake, Utah, United States of America
Source: Dodge USA
The project is located on 700 North between 2200 West and Redwood Road and 600 North between Catherine Street and 800 West. The sewer main west of Redwood Road is in poor condition and requires rehabilitation. The sewer main east of Redwood Road will be rehabilitated also, in advance of the City Engineering Roadway Reconstruction project. The 21" main west of Redwood Road has cracks and fractures
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- North Salt Lake, Utah, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 700 North Sewer Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is located on 700 North between 2200 West and Redwood Road and 600 North between Catherine Street and 800 West. The sewer main west of Redwood Road is in poor condition and requires rehabilitation. The sewer main east of Redwood Road will be rehabilitated also, in advance of the City Engineering Roadway Reconstruction project. The 21" main west of Redwood Road has cracks and fractures throughout and is broken. Rehabilitation of approximately 10,775 feet of 8, 10, 18, 21, and 30-in... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Utah |
City | North Salt Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-06-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
