logo

75-MW Reactor Design

Sector: Power Generation (CCGT) • Location: Idaho, United States

Source: Utility Dive

Project
Planned

Oklo has revealed a new 75-MW reactor design aimed at supporting the energy needs of large data center customers. The design expands from a previous 50-MW model and is set for commercial deployment at Idaho National Laboratory by late 2027 or early 2028.

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Power Transmission, Nuclear, Data Center
Location
Idaho, United States of America
Updated
22 Jul 2026
Source
Utility Dive

ConstructChat

Ask ConstructChat about 75-MW Reactor Design

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “75-MW Reactor Design” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Idaho, United States. Taiyo aggregates data on it from Utility Dive.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Oklo has revealed a new 75-MW reactor design aimed at supporting the energy needs of large data center customers. The design expands from a previous 50-MW model and is set for commercial deployment at Idaho National Laboratory by late 2027 or early 2028.

Original sector

Energy

Location

Country

United States of America (USA)

State

Idaho

Source

Source

Utility Dive

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Power Transmission, Nuclear, Data Center

Article published date

2025-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project