765-kV Texas Transmission Line from Schleicher County to Bell County
Sector: Power Transmission • Location: Texas, United States
Source: Utility Dive
Oncor Electric Delivery and LCRA Transmission Services proposed constructing a 765-kV transmission line approximately 214 to 244 miles long as part of Texas' effort to build a high-voltage transmission network to meet growing power demand in the Permian Basin. The project aims to improve power flow, increase system reliability and resilience, and support new loads in the region.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | planned |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Oncor Electric Delivery and LCRA Transmission Services proposed constructing a 765-kV transmission line approximately 214 to 244 miles long as part of Texas' effort to build a high-voltage transmission network to meet growing power demand in the Permian Basin. The project aims to improve power flow, increase system reliability and resilience, and support new loads in the region. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
