logo

787 Dreamliner Expansion in South Carolina

Sector: Airport • Location: North Charleston, South Carolina, United States

Source: AeroTime

Project
Under Construction

Boeing has begun a $1 billion expansion of its 787 Dreamliner facilities in North Charleston, South Carolina, to increase production to 10 aircraft per month in 2026. The expansion includes a second 1.2 million-square-foot final assembly building, new support facilities, additional flight line capacity, a parts preparation facility, a vertical fin paint building, and additions to the Interiors Res

Status
Under Construction
Sector
Airport, Aerospace & Defense, Manufacturing (Industrial), Commercial
Location
North Charleston, South Carolina, United States of America
Updated
22 Jul 2026
Source
AeroTime

ConstructChat

Ask ConstructChat about 787 Dreamliner Expansion in South Carolina

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “787 Dreamliner Expansion in South Carolina” is an infrastructure initiative in the Airport sector, located in North Charleston, South Carolina, United States. Taiyo aggregates data on it from AeroTime.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Boeing has begun a $1 billion expansion of its 787 Dreamliner facilities in North Charleston, South Carolina, to increase production to 10 aircraft per month in 2026. The expansion includes a second 1.2 million-square-foot final assembly building, new support facilities, additional flight line capacity, a parts preparation facility, a vertical fin paint building, and additions to the Interiors Responsibility Center.

Original sector

Aviation

Budget

Location

Country

United States of America (USA)

State

South Carolina

City

North Charleston

Source

Source

AeroTime

URL

More Details

Record type

Project

Sector

Airport, Aerospace & Defense, Manufacturing (Industrial), Commercial

Article published date

2025-11-12

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project