79th Avenue North Multi-Use Path
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This project includes construction of an asphaltic multi-use path along 79th Avenue North as well as resurfacing the entirety of 79th Avenue North to include landscaping, curb, gutter, concrete driveway stem extensions, widening existing sidewalks, and constructing crosswalks
- Status
- Closed
- Sector
- Cement, Road, Car parking, Automotive, Government, Commercial
- Location
- Myrtle Beach, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 79th Avenue North Multi-Use Path
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project includes construction of an asphaltic multi-use path along 79th Avenue North as well as resurfacing the entirety of 79th Avenue North to include landscaping, curb, gutter, concrete driveway stem extensions, widening existing sidewalks, and constructing crosswalks |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Myrtle Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Car parking, Automotive, Government, Commercial |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
