7Brew Coffee - Enid, OK
Sector: Manufacturing (Industrial) • Location: Enid, Oklahoma, United States of America
Source: Dodge
This is a ground up project for 7Brew Coffee. Please note that these are modular, pre-fabricated buildings, not field built. Building's will come pre-wired, pre-plumbed, with ductwork installed. Canopies will be installed by the owner as well. Scopes include subgrade preparation, utilities, concrete, fencing & gates, landscaping, CMU, insulation, joint sealants, plumbing, mechanical, and electrica
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Power Transmission, Commercial, Fertilizers, Raw Materials, Cement, Consumer Products
- Location
- Enid, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 7Brew Coffee - Enid, OK
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding-Invitation |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is a ground up project for 7Brew Coffee. Please note that these are modular, pre-fabricated buildings, not field built. Building's will come pre-wired, pre-plumbed, with ductwork installed. Canopies will be installed by the owner as well. Scopes include subgrade preparation, utilities, concrete, fencing & gates, landscaping, CMU, insulation, joint sealants, plumbing, mechanical, and electrical. Scope of work document is included with the bid. Lastly, a copy of the owner's bid form has be... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Enid |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Power Transmission, Commercial, Fertilizers, Raw Materials, Cement, Consumer Products |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
