logo

7MW Solar Power Project under Mukhyamantri Saur Krushi Vahini Yojana 2.0

The owner, status and timeline of this project. A free account opens every field.

Source: ET Energy World

Project
Completed

A new 7MW solar power project inaugurated at the Bhaur power substation in Deola taluka of Nashik, Maharashtra, under the Mukhyamantri Saur Krushi Vahini Yojana 2.0. The project comprises two units, a 4MW facility at Vithewadi and a 3MW facility at Bhaur, providing assured daytime electricity supply to 1,316 agricultural pumps across Vithewadi, Bhaur, and Bagdu regions, supporting agricultural dev

Status
Closed
Sector
Raw Materials, Power Generation (CCGT), Solar, Government
Location
Nashik, Maharashtra, India
Updated
22 Jul 2026
Source
ET Energy World

ConstructChat

Ask ConstructChat about 7MW Solar Power Project under Mukhyamantri Saur Krushi Vahini Yojana 2.0

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “7MW Solar Power Project under Mukhyamantri Saur Krushi Vahini Yojana 2.0” is an infrastructure initiative in the Raw Materials sector, located in Nashik, Maharashtra, India. Taiyo aggregates data on it from ET Energy World.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A new 7MW solar power project inaugurated at the Bhaur power substation in Deola taluka of Nashik, Maharashtra, under the Mukhyamantri Saur Krushi Vahini Yojana 2.0. The project comprises two units, a 4MW facility at Vithewadi and a 3MW facility at Bhaur, providing assured daytime electricity supply to 1,316 agricultural pumps across Vithewadi, Bhaur, and Bagdu regions, supporting agricultural development and environmental conservation.

Original sector

Energy

Location

Country

India

State

Maharashtra

City

Nashik

Source

Source

ET Energy World

URL

More Details

Record type

Project

Sector

Raw Materials, Power Generation (CCGT), Solar, Government

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project