7th Street & Shelter Bay Drive Drainage Improvements
Sector: Water Supply and Storage • Location: Key Colony Beach, Florida, United States of America
Source: Dodge
The Project includes the following Work: Base Bid: Conversion of existing dry detention pond into a wet detention system with outfall structures and check valves. Miscellaneous drainage improvements, landscaping, and fountains. Additive Alternate No. 1 includes drainage improvements along 7th Street and golf course. Additive Alternate No. 2 include pervious paver work. Additive Alternate No. 3 inc
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Raw Materials, Waste Processing and Treatment, Government
- Location
- Key Colony Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 7th Street & Shelter Bay Drive Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: Base Bid: Conversion of existing dry detention pond into a wet detention system with outfall structures and check valves. Miscellaneous drainage improvements, landscaping, and fountains. Additive Alternate No. 1 includes drainage improvements along 7th Street and golf course. Additive Alternate No. 2 include pervious paver work. Additive Alternate No. 3 includes an allowance for an observation deck. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Key Colony Beach |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Road, Commercial, Raw Materials, Waste Processing and Treatment, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
