8 Phase Quad Left Signalized Intersection Construction
One of 10,000+ projects Taiyo tracks in Arkansas.
Source: Dodge USA
installation of pole bases, conduit, pull boxes, traffic control cabinet and pad, installation of signal heads and poles and pole arms, all the wiring of signals and in the cabinet and the detection that will be used at this location. The City of Rogers will purchase and provide all the poles, pole arms, traffic control cabinet, signal heads, pedestrian heads, push buttons, all traffic cabinet int
- Status
- Closed
- Sector
- Road, Government, Commercial
- Location
- Rogers, Arkansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 8 Phase Quad Left Signalized Intersection Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | installation of pole bases, conduit, pull boxes, traffic control cabinet and pad, installation of signal heads and poles and pole arms, all the wiring of signals and in the cabinet and the detection that will be used at this location. The City of Rogers will purchase and provide all the poles, pole arms, traffic control cabinet, signal heads, pedestrian heads, push buttons, all traffic cabinet internals and the detection equipment, mounting hardware and the wire. The contractor will provide t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arkansas |
City | Rogers |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
