logo

80-metre-long steel bridge for Mumbai-Ahmedabad Bullet Train project

Under construction · Gujarat · Last reported Jul 2026

Source: Ahmedabad Mirror

Project
Under Construction

An 80-metre-long steel bridge weighing 1,004 metric tonnes was installed over the Anupam Flyover in Ahmedabad as part of the Mumbai-Ahmedabad Bullet Train project. The bridge was installed using hydraulic jacks and is a 'Make in India' initiative.

Status
Under Construction
Sector
Rail, Steel
Location
Ahmedabad, Gujarat, India
Updated
22 Jul 2026
Source
Ahmedabad Mirror

ConstructChat

Ask ConstructChat about 80-metre-long steel bridge for Mumbai-Ahmedabad Bullet Train project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “80-metre-long steel bridge for Mumbai-Ahmedabad Bullet Train project” is an infrastructure initiative in the Rail sector, located in Ahmedabad, Gujarat, India. Taiyo aggregates data on it from Ahmedabad Mirror.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

An 80-metre-long steel bridge weighing 1,004 metric tonnes was installed over the Anupam Flyover in Ahmedabad as part of the Mumbai-Ahmedabad Bullet Train project. The bridge was installed using hydraulic jacks and is a 'Make in India' initiative.

Original sector

Transportation

Location

Country

India

State

Gujarat

City

Ahmedabad

Source

Source

Ahmedabad Mirror

URL

More Details

Record type

Project

Sector

Rail, Steel

Article published date

2026-07-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project