80-metre-long steel bridge for Mumbai-Ahmedabad Bullet Train project
Under construction · Gujarat · Last reported Jul 2026
Source: Ahmedabad Mirror
An 80-metre-long steel bridge weighing 1,004 metric tonnes was installed over the Anupam Flyover in Ahmedabad as part of the Mumbai-Ahmedabad Bullet Train project. The bridge was installed using hydraulic jacks and is a 'Make in India' initiative.
- Status
- Under Construction
- Sector
- Rail, Steel
- Location
- Ahmedabad, Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Ahmedabad Mirror
ConstructChat
Ask ConstructChat about 80-metre-long steel bridge for Mumbai-Ahmedabad Bullet Train project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | An 80-metre-long steel bridge weighing 1,004 metric tonnes was installed over the Anupam Flyover in Ahmedabad as part of the Mumbai-Ahmedabad Bullet Train project. The bridge was installed using hydraulic jacks and is a 'Make in India' initiative. |
Original sector | Transportation |
Location
Country | India |
State | Gujarat |
City | Ahmedabad |
Source
Source | Ahmedabad Mirror |
URL |
More Details
Record type | Project |
Sector | Rail, Steel |
Article published date | 2026-07-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
