800 MW PARBATI HYDRO ELECTRIC PROJECT - II
Sector: Hydro • Location: Mandi, Himachal Pradesh, India
Source: India Investment Grid (IIG)
Information NHPC has come up with 800 MW PARBATI HYDRO ELECTRIC PROJECT - II with a ticket size of 11134.5 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Parbati Hydroelectric Project-Stage-II is a run-of-the-river scheme propose
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information NHPC has come up with 800 MW PARBATI HYDRO ELECTRIC PROJECT - II with a ticket size of 11134.5 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Parbati Hydroelectric Project-Stage-II is a run-of-the-river scheme proposed to harness hydro potential of the lower reaches of the river Parbati. The river is proposed to be diverted with a Concrete Gravity Dam at Village Pulga in Parbati valley through 31.5 Km long Head Race Tunnel and the Power House is located at village Suind in Sainj valley. Thus gross head of 863m between Pulga and Suind will be utilized for generating 800MW power. The diverted discharge of the river Parbati has been further augmented by diverting the discharge of various Nallahs falling along the HRT alignment. The Project was approved at an original cost of Rs. 3919.59 Crores -Dec. 2001 P.L. The Project will generate 3124.6 MUs annually in a 90 percent dependable year. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
