logo

800 MW PARBATI HYDRO ELECTRIC PROJECT - II

Sector: Hydro • Location: Mandi, Himachal Pradesh, India

Source: India Investment Grid (IIG)

Project
Closed

Information NHPC has come up with 800 MW PARBATI HYDRO ELECTRIC PROJECT - II with a ticket size of 11134.5 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Parbati Hydroelectric Project-Stage-II is a run-of-the-river scheme propose

Project Information FAQ

Project Information

5 Q
The project “800 MW PARBATI HYDRO ELECTRIC PROJECT - II” is an infrastructure initiative in the Hydro sector, located in Mandi, Himachal Pradesh, India. Taiyo aggregates data on it from India Investment Grid (IIG).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Information NHPC has come up with 800 MW PARBATI HYDRO ELECTRIC PROJECT - II with a ticket size of 11134.5 INR Crores. This project in Energy Generation [Renewable] sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project Parbati Hydroelectric Project-Stage-II is a run-of-the-river scheme proposed to harness hydro potential of the lower reaches of the river Parbati. The river is proposed to be diverted with a Concrete Gravity Dam at Village Pulga in Parbati valley through 31.5 Km long Head Race Tunnel and the Power House is located at village Suind in Sainj valley. Thus gross head of 863m between Pulga and Suind will be utilized for generating 800MW power. The diverted discharge of the river Parbati has been further augmented by diverting the discharge of various Nallahs falling along the HRT alignment. The Project was approved at an original cost of Rs. 3919.59 Crores -Dec. 2001 P.L. The Project will generate 3124.6 MUs annually in a 90 percent dependable year.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data