800 MW Ultra-Supercritical Boiler Project
Sector: Power Generation (CCGT) • Location: India
Source: Whalesbook
Thermax's subsidiary secured a ₹1,600 Crore order for supplying an ultra-supercritical boiler for an 800 MW power project. The deal covers everything from manufacturing to commissioning. The ultra-supercritical boiler operates at higher temperature and pressure than current plants, resulting in higher energy output and lower pollution.
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial)
- Location
- India
- Updated
- 22 Jul 2026
- Source
- Whalesbook
ConstructChat
Ask ConstructChat about 800 MW Ultra-Supercritical Boiler Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Thermax's subsidiary secured a ₹1,600 Crore order for supplying an ultra-supercritical boiler for an 800 MW power project. The deal covers everything from manufacturing to commissioning. The ultra-supercritical boiler operates at higher temperature and pressure than current plants, resulting in higher energy output and lower pollution. |
Original sector | Industrial Goods/Services |
Budget |
Location
Country | India |
Source
Source | Whalesbook |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-03-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
