800 MWh Battery Energy Storage System (BESS) Project
Sector: Power Generation (CCGT) • Location: Rajasthan, India
Source: Energetica India Magazine
O2 Power has secured a renewable energy project of 800MWh Battery Storage System (BESS) under competitive bidding conducted by Solar Energy Corporation of India Limited (SECI). The project aims to provide non-solar peak hour power supply and is strategically located near an operational CTUIL substation in Rajasthan, leveraging abundant solar resources.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Energy Storage, Solar
- Location
- Rajasthan, India
- Updated
- 22 Jul 2026
- Source
- Energetica India Magazine
ConstructChat
Ask ConstructChat about 800 MWh Battery Energy Storage System (BESS) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | O2 Power has secured a renewable energy project of 800MWh Battery Storage System (BESS) under competitive bidding conducted by Solar Energy Corporation of India Limited (SECI). The project aims to provide non-solar peak hour power supply and is strategically located near an operational CTUIL substation in Rajasthan, leveraging abundant solar resources. |
Original sector | Energy |
Location
Country | India |
State | Rajasthan |
Source
Source | Energetica India Magazine |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Energy Storage, Solar |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
